SBS1 was awarded the contract for the complete upgrade of the HVAC system at the German International School in Abu Dhabi. The project involved the supply, installation, and commissioning of 40 high-capacity packaged HVAC units, each ranging between 15 to 25 tons.

The objective was to enhance cooling efficiency, indoor air quality, and energy performance across academic, administrative, and recreational zones within the school campus. All works were executed with careful scheduling to minimize disruption to the school’s academic calendar and ensure compliance with regulatory standards for educational facilities.

By delivering a robust and scalable climate control system, SBS1 contributed to creating a more comfortable and sustainable learning environment.

Project Overview

Client: German International School at Abu Dhabi
Project Name: New HVAC System Installation
Quantity: 40 Packaged Units (15–25 Tons Capacity)
Scope: Supply, Installation, Testing & Commissioning of HVAC System

Scope Checklist

1. Supply

✅ 40 high-efficiency packaged HVAC units (15–25 tons)

✅ Mounting frames, duct accessories, and vibration isolators

✅ Thermostats, sensors, and control panels

✅ Necessary cabling and electrical components

2. Installation

✅ Rigging and placement of rooftop and ground-mounted units

✅ Ductwork connections and air distribution setup

✅ Refrigerant piping and insulation

✅ Electrical connections and control wiring

✅ Drainage and condensate line installation

✅ Unit labeling and zone mapping

3. Testing & Commissioning

✅ Startup and performance testing for each unit

✅ Airflow balancing and temperature calibration

✅ BMS integration (if applicable)

✅ System safety checks and operational tuning

✅ Training for school maintenance personnel

✅ Documentation and handover package submission